Back to Blog
![]() The superpanels contain structural upgrades and cutouts for the VC-25B lower lobe doors, including internal airstairs for mission requirements.” -US Air Force Life Cycle Management Center ![]() “The first phase of aircraft modification involves cutting out large skin and structure areas in both the forward and aft lower lobes of the aircraft and then installing two newly manufactured superpanels. Here is what initial modifications will consist of: On February 25 th at Boeing’s San Antonio, Texas facility, modifications began for the first of two 747-8s. Photo: Alex Beltyukov via Wikimedia Commons Modification phase now underway Transaero never received the 747-8s, going bankrupt before delivery.
0 Comments
Read More
Leave a Reply. |